Exploring Fec920 May 2 2019
Exploring Fec920 May 2 2019 reveals several interesting facts.
- Pink Lady425 howling to pull a lumber beam and twenty-seven loaded hoppers on the Pineda Turn. EoT past MP236 at 8:47am.
- 508 with twenty-seven loads. EoT past MP236 at 7:03am.
- 431 with twenty-eight cars for Lake Washington at MP188. EoT past MP236 at 7:07am.
- 508 with forty-seven loads. EoT past MP236 at 7:29am.
- 508 with a gon on the head end and forty-one hopper loads. TBOX in there, too. EoT past MP236 at 7:34am.
In-Depth Information on Fec920 May 2 2019
428LHF with a gon ahead of twenty-seven hoppers and a box on the rear end. EoT past MP236 at 7:19am. 508LHF headed to MP188 to work the Lake Washington facility. EoT past MP236 at 7:36am. 428 with sixty-five loads on the Pineda Turn. EoT past MP236 at 8:28am. 415 with a gon full of ties, about fifty rock loads and a covered hopper on the rear end. EoT past MP236 at 8:32am.
416 with ten gondola loads, twenty-seven hoppers and a box on the rear end. EoT past MP236 at 7:20am.
Stay tuned for more updates related to Fec920 May 2 2019.